Banner
Home > Product >> Copper Melting Refining Furnace

Gas Fired Tilting Copper Refining Furnace

Gas Fired Tilting Copper Refining Furnace

Product Details

This furnace is used to refine scrap copper, the refined molten copper could be cast into anode copper plates through anode casting machine or low-oxygen copper rod through ccr line(continuous casting and rolling line)


Product Features (Characteristics)
Compared to traditional reverberatory furnace:
1.The gas fired hydraulic tilting copper refining furnace is more environmentally friendly and has higher thermal efficiency.
2.The Oxidation-reduction of the furnace is more complete and it needs less manpower

Gas Fired Tilting Copper Refining Furnace

Gas Fired Tilting Copper Refining Furnace


Copper Melting Refining Furnace

Copper Melting Refining Furnace


Gas Fired Tilting Copper Refining Furnace manufacturer

Gas Fired Tilting Copper Refining Furnace manufacturer

Product Appearance (Structure)
Components:
furnace body, hydraulic system, oxidation-reduction system, DC motor driving system, combustion system, electric control system.

Product Working Method (Principle)
The process of the refining by the tilting refining furnace is three steps:
1.Oxidation and slagging: inject compressed air into the molten copper liquid to make metal impurities oxidized to form slag.
2.Deslagging: manual deslagging through deslagging door.
3.Reduction: inject natural gas into the copper liquid to make replacement reaction to restore copper.

Product Model (Specification Parameters)

Model10T30T50T60T
Copper melting time5~8hours5~8hours~8hours~8hours
Oxidation time~1.5hours~1.5hours~2hours~2hours
Reduction time~1.5hours~1.5hours~2hours~2hours
Gas consumption per ton copper80-120NM380-120NM380-120NM380-120NM3
Installed capacity50KW100KW100KW120KW
Maximum heating value1000000Kcal/h4000000kcal/h4000000kcal/h4500000kcal/h

Logistics
We have professional export team and logistics team which have many years of enperiences of exporting and tranporting the equipment to save you any troubles in delivering the equipment to your site, the machines could be dealed in Incoterms of FOB Shanghai or CIF destination or as designated by you.

Installation
We would send you our engineers to guide you in installation and commissioning of your equipment, also our engineers will train your people in how to operate and maintain your equipment.

After Sale
Our company has set up a number of tough emergency service team, on-site experienced engineers and senior technicians who can arrive on the scene in the fastest time for any problems, maintenance and replacement.
The warranty period of our equipment is one year from the date of completion of commissioning. During the warranty period, the fees of maintenance and materials caused by the bad quality of our equipment will be borned by our company; the fees of maintenance and materials caused by the buyer will be borned by the buyer.


Feedback